Michael Robinett


Architecture, Urban Design, Interiors, Graphics, Research & Development


Project List & Chronology

1977

Institute of Electricity & Electronics: TAC

Tlemcen, Algeria

..............................................................

1977

St. Francis-St.George Hospital: TAC

Cincinati, Ohio USA

..............................................................

1977

Jubail New Community Masterplan: TAC

Jubail, Saudi Arabia

..............................................................

1977

University of Virginia Primary Care Center: TAC

Charlottesville, Virginia USA

..............................................................

1977

Barnard & Millbank Halls: TAC

Barnard College, New York USA

..............................................................

1977

Clinton Mill Apartments: TAC

Clinton, Massachusetts USA

..............................................................

1977

Babahani-Zabin Proposal: TAC

Kuwait, Kuwait

..............................................................

1977

Northeast Sawaber Housing: TAC

Kuwait, Kuwait

..............................................................

1977

West Pennsylvania Hospital: TAC

Pittsburg, Pennsylvania USA

..............................................................

1977

Corning YMCA: TAC

Corning, New York USA

..............................................................

1977

Bates College Atheletic Facility: TAC

Presentation drawings & study model for a new atheletic facility.

..............................................................

1977

Jubail School Prototype Studies: TAC

Jubail, Saudi Arabia

Technical assistance on analysis of population demographics and space allocations for primary and secondary schools, site requirements, etc. under Project Architect in charge of study. Coordination with Architects from Saudi Arabia.

..............................................................

1977-1978

Jubail Prototype Studies for Community Facilities: TAC

Jubail, Saudi Arabia

Technical, architectural design and programming assistance on sketch studies and prototype designs for new community facilities.

..............................................................

1977-1978

Jubail New Community Masterplan: TAC

Jubail, Saudi Arabia

Urban design and technical assistance on infrastructure and land use planning for the overall masterplan. Infrastructure and land use allocation for District A.

..............................................................

1978

Jubail First Sector Masterplan: TAC

Jubail, Saudi Arabia

Technical & urban design assistance on the first detailed programmatic study of the masterplan area. Neighborhoods were comprised of similar housing types with an assumed correlation of income group and housing type.

Program area: 188 hectares.

..............................................................

1979

Jubail First Sector, Zones B13-B14: TAC

Jubail, Saudi Arabia

Third in a series of detailed, programmatic studies of the masterplan for the First Sector area. Urban designer in charge of layout of the tertiary road network, park system or landscape corridors, siting of housing and community facilities, and general layout of pedestrian network. Coordination with Bechtel Corporation, consultant to the Saudi Arabian Royal Commission for Jubail and Yanbu. Coordination with Colin, Buchanan & Partners of London, UK and Bechtel Corporation on interpretation of demographic statistics and economic structure studies, planning of road networks, population density mix proportional to land area and regional climatic studies. The neighborhoods were comprised of a mix of density types and an assumed correlation of mix of income groups.
Program Area: 193 hectares.

..............................................................

1979

The Chrysler Building: Ahearn-Freedenfeld Associates

New York, New York USA

Architectural, urban design & economic study in conjunction with Turner Construction of New York for development of the area between the twin towers of the Chrysler Building complex. Architectural design models & presentation drawings.

..............................................................

1979-1980

GSIS Headquarters Building: TAC

Manila, The Phillippines

Technical assistance on study models for the schematic design phase. Programming & masterplanning on preliminary studies of the new Government Services Insurance System Headquarters Building.

..............................................................

1979-1980

Kuwait Institute for Scientific Research: TAC

Kuwait, Kuwait

Masterplanning & architectural design assistance to the Project Architect on new facilities for scientific research and housing for a proposed international community of scientists. Structural & mechanical studies with emphasis on the use of solar collectors in the building design in conjunction with Ove Arup & Partners and PACE Engineering.

..............................................................

continued next page

..............................................................

[E-mail]

Copyright 2008 Michael Robinett